Hello to all!
Some three weeks ago i've started to work on a system copy, from PROD to a new DEV server, which was meant to replace our current DEV server.
I was using a backup of the PROD server from 24.11.2014 to build the new server.
Today i have the new DEV server ready to go, ready to be integrated in the system landscape.
My question is:
What happens with all the customisation that was made on the old DEV server from 24.11 until today? I assume that if i transport all the customisations from the old DEV to the QAS and PROD, they will have the new configuration, but when i replace the DEV server, it will be at the 24.11 state, without the latest changes.
How can i import in the new DEV server the changes made in the meantime?
Thanks to all for help!